Diamond-Like Carbon PVD Advantages | 3 000 HV Nano-Finish China – JLY Precision Tech

Explore the full advantages of diamond-like carbon PVD coatings: 3 000 HV hardness, 0.04 friction, 1 000 °C stability, FDA & REACH compliance. JLY Precision Tech delivers ta-C DLC in 7 days.

1. Diamond-Like Carbon PVD Advantages – Executive Summary

Advantage ta-C DLC (PVD) Electroplated Ni Spray Paint
Hardness (HV) 3 000 700 200
Friction vs. steel 0.04 0.3 0.4
Max service temp (°C) 1 000 300 150
Wear rate @ 600 °C 5.2×10⁻⁷ mm³/N·m 5.0×10⁻⁵ 1.2×10⁻⁴
FDA/REACH ✅ Compliant ⚠️ Restricted ⚠️ Limited

2. 2024 Performance Matrix – ta-C DLC vs Legacy Finishes

Metric ta-C DLC TiAlCrN Electroless Ni DLC Spray
Thickness (µm) 0.1–3 1–5 5–50 25–100
Salt-spray (h) 1 000 1 200 48 48
Biocompatibility
Cost / m² (China) 2.8 USD 3.2 USD 2.5 USD 0.8 USD

3. How DLC Works – From sp³ Bonds to Surface

Step Vacuum Level Temp (°C) Action KPI
1 Plasma Clean 10⁻³ mbar 25 Ar⁺ removes oxide & oil Contact angle ≤ 8°
2 Bond Layer 10⁻³ mbar 200 50 nm Cr for adhesion Calot ±2 nm
3 ta-C Deposition 10⁻⁴ mbar 150–400 Filtered arc sp³-C ±3 nm uniformity
4 QA & Pack Air 25 CT + nano-indent + salt-spray CpK ≥ 1.67

4. Three 2024 Case Studies

Case 1 – Medical Drill (ta-C DLC)

  • Client: EU MedTech startup, 2024
  • Challenge: 316L drill needs CE-compliant low-friction finish
  • Stack: ta-C 300 nm + Cr 30 nm
  • Outcome: Penetration force −25 %, CE mark granted

Case 2 – EV Motor Punch (ta-C DLC)

  • Client: US EV Tier-1, 2024
  • Challenge: 0.35 mm electrical steel sticking at 400 °C
  • Stack: ta-C 1 µm on H13
  • Outcome: Tool life 4× longer, scrap −40 %

Case 3 – Optical Lens (ta-C DLC)

  • Client: Global OEM, 2024
  • Challenge: BK7 glass needs AR + scratch resistance
  • Stack: ta-C 100 nm + SiO₂ 200 nm
  • Outcome: Reflection < 0.2 %, 9H hardness

5. Global Standards & Sustainability

  • ISO 9001:2015 / IATF 16949 / ISO 13485
  • REACH, RoHS, FDA 21 CFR §175.300
  • Energy: 0.35 kWh per m²
  • Waste: Zero liquid effluent

6. 7-Day Delivery Timeline

Milestone Lead Time
DFM + Quote 24 h
Prototype (1–10 pcs) 48 h
Validation (CT, salt-spray) 5 days
Mass Production 7–10 days
Door-to-Door Delivery 12 days total

7. FAQs – Advantages in Real-World Use

Question Answer
Can DLC coat plastics? Yes—PEEK, LCP.
Largest part? 800 mm Ø × 1200 mm L.
Minimum order? 1 piece.

8. How to Order Tomorrow

  1. Email [email protected] with STEP/IGES.
  2. Specify substrate, load, temperature, thickness budget.
  3. Receive DFM + diamond-like carbon PVD advantages quote within 48 h.
  4. Approve → 3-day prototype → volume ramp.
Explore complementary services: Professional Anodizing Near Me
Author picture
Welcome To Share This Page:
Case Study
Get A Free Quote Now !
Contact Form Demo (#3)
Scroll to Top

Get A Free Quote Now !

Contact Form Demo (#3)
If you have any questions, please do not hesitate to contatct us.
Scan the code